NEW QUESTION # 42
What are some of the features of the network charts in SAP Integrated Business Planning for Supply Chain? Note: There are 2 correct answers to this question

  • A. You can create a network chart from the dedicated app, or use the Analytic Advanced app
  • B. You can create a network chart from the dedicated app, or use the Manage Analytic Stories app
  • C. To display the network chart, you need the Ship-From Location master data type in the planning area
  • D. The network charts visualize relationships between warehouse, plants, customer, and supplier, for finished goods

Answer: A,D


NEW QUESTION # 43
A company only purchases a license for the SAP IBP S&OP module and wants to maximize the use of its standard functionality. What processes will they be able to cover? Note: There are 3 correct answers to this question O Get system-solving recommendations on how to react to production bottlenecks

  • A. Prepare versions of S&OP plan based on different optimizer modelling costs
  • B. Review critical resources against demand
  • C. Conduct Sales and Operations Planning meeting with cross functional representatives
  • D. Build what if scenario for breaching supply-demand gaps

Answer: A,C,D


NEW QUESTION # 44
What are the S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
  • B. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
  • C. Number of fair share segments Additional tiering costs (default) Inventory days of supply
  • D. Number of fair share segments Additional tiering costs (default) Maximum inventory

Answer: A


NEW QUESTION # 45
You are configuring disaggregation for the KF 1 key figure in the Planning Areas Model Configuration app. Which methods can you use? Note: There are 3 correct answers to this question

  • A. Disaggregation according to an equal split
  • B. Disaggregation according to user-defined expression
  • C. Disaggregation according to a helper key figure
  • D. Proportional disaggregation by using KF2 in the expression
  • E. Disaggregation in batch triggered by an application job

Answer: A,B,D


NEW QUESTION # 46
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3correct answers to this question

  • A. Key figure type
  • B. Attributes
  • C. Scenario ID
  • D. Reason code
  • E. Modified code

Answer: B,D,E


NEW QUESTION # 47
Which processes are embedded in the sample planning areas SAP6 and SAP3?

  • A. SAP6 Demand Planning and Sensing, and SAP3 Inventory Planning
  • B. SAP6 Demand Planning and Sensing, and SAP3 Control Tower
  • C. SAP6 Control Tower, and SAP3 Sales and Operations Planning and Supply Planning
  • D. SAP6 Sales and Operations Planning and Supply Planning, and SAP3 Inventory Planning

Answer: A


NEW QUESTION # 48
The S&OP Operator Profiles app is used to configure different types of algorithms. Which algorithm- specific settings are unique for the Time Series-based Supply Optimizer? Note: There are 2 correct answers to this question.

  • A. Time profile level
  • B. Global cost factors
  • C. Discretization
  • D. Processing mode

Answer: B,C


NEW QUESTION # 49
Which of the following solutions should be satisfied with violations penalized by the objective function ofthe time-series supply optimizer? Note: There are 3 correct answers to this question. Not adhering to maximum transport values

  • A. Not-fully satisfied demands
  • B. Not respecting production capacity
  • C. Violation of minimum aggregated inventory vales
  • D. Violation of minimum resource utilization

Answer: A,C,D


NEW QUESTION # 50
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question.

  • A. Specify a planning horizon in the planning area for each level of the assigned time profile
  • B. Configure at least one calculated key figure for the planning area
  • C. Configure at most two input key figures on the same planning level in a key figure calculation
  • D. Assign the compound master data type and its component master data types

Answer: A,D


NEW QUESTION # 51
Analytics charts are created by the user in the Advanced Analytics application. What can the user do in the Advanced Analytics app? Note: There are 2 correct answers to this question.

  • A. Merge charts together.
  • B. Group Data
  • C. Applying filters on there data
  • D. Trigger export to Manage Analytics stories

Answer: B,C


NEW QUESTION # 52
Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question

  • A. Location
  • B. Product
  • C. DS Order fulfilment
  • D. Transportation lane
  • E. Customer

Answer: A,B,E


NEW QUESTION # 53
How many different time levels can be selected within one planning view?

  • A. All time levels available in the time profile, restricted by global configuration parameter
  • B. The number of time levels is restricted to four to avoid negative effects on performance
  • C. All time levels available in the time profile
  • D. Only time levels from the base planning level of selected key figures

Answer: A


NEW QUESTION # 54
Which functional capabilities are included in SAP IBP for response and supply? Note: There are 2 correct answers to this question

  • A. Analyse supply Usage
  • B. Detailed Production Scheduling
  • C. Calculating buffer proposals
  • D. Gating Factor

Answer: A,D


NEW QUESTION # 55
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be appliedto? Note: There are 2 correct answers to this question.

  • A. Jobs in the Application jobs app
  • B. Planning view template in the SAP IBP, add-in for Microsoft Excel
  • C. Supply chain graph in Supply Chain Network app
  • D. Compare function in the Planning Areas app

Answer: A,B


NEW QUESTION # 56
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, add-infor Microsoft Excel, and you are receiving an error related to missing combinations. How can you resolve this problem? Note: There are 2 correct answers to this question

  • A. Use the Copy Operator to create the missing combinations
  • B. Use the function New Planning Object in Excel UI to create missing combination
  • C. Use the Manage the master data app to create missing combinations
  • D. Use the Data Integration app to upload the missing combinations

Answer: B,D


NEW QUESTION # 57
What are some of the actions configurators can do when working correct answers to this question

  • A. Copy key figure data from any version to any version
  • B. Run an application job to purge obsolete versions
  • C. Delete key figure data for a date range for all versions at once
  • D. Copy master data from base version to other version

Answer: C,D


NEW QUESTION # 58
You are setting up planning with lot sizes. What are some of the properties of lot sizes that you need to beware of? Note: There are 2 correct answers to this question

  • A. Lot size are time-independent master data settings
  • B. Periodic lot size setting overrides the minimum lot size.
  • C. Lot size are applicable for production and transportation quantities
  • D. Lot sizes are applicable for production and handling quantities.

Answer: A,C


NEW QUESTION # 59
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question

  • A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
  • B. Identify inventory items that quire closer attentions
  • C. Substitute missing values in case of sporadic demands.
  • D. Choose time-independent key figures as segmentation measures

Answer: B,D


NEW QUESTION # 60
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.

  • A. Minimum capacity utilization will result in pull production
  • B. Capacity leveling will be possible for production and storage resources.
  • C. Excess stock can be generated and will need to be staged in an overflow warehouse
  • D. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs

Answer: C,D


NEW QUESTION # 61
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check Which settings can you change and still run a successful consistency check? Note: There are 2 correct answers to this question

  • A. Add a new time profile level to the time profile
  • B. Change the numbering hierarchy of the period IDS in the time profile.
  • C. Change the description of attribute in the time profile
  • D. Change the past and future horizon of the level in the time profile

Answer: C,D


NEW QUESTION # 62
What is an example of a commonly used time-independent key figure?

  • A. Any attribute as a key figure
  • B. A currency conversion key figure, such as Exchange Rate
  • C. A Special key figure marked as an aggregate key figure (aggregate constraint)
  • D. A unit of measure key figure, such as UoM Conversion Factor

Answer: A


NEW QUESTION # 63
Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question.

  • A. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network
  • B. It reports input key figure for which no related master data exists.
  • C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network
  • D. It checks whether the sourcing in the Production Source Item master data type exists.
  • E. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network

Answer: A,D,E


NEW QUESTION # 64
......


SAP C_IBP_2311 Exam Syllabus Topics:

TopicDetails
Topic 1
  • General Configuration of a Planning Area
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
Topic 2
  • Configure supply planning, run various solvers to generate planning results
  • Optimize the integration scenarios and architecture of your planning solution
Topic 3
  • Create and transform forecasts in your planning model
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
Topic 4
  • Create and use key figures and attributes to model the supply chain
  • Define and view information with user-defined charts and dashboards

 

Authentic Best resources for C_IBP_2311 Online Practice Exam: https://surepass.actualtests4sure.com/C_IBP_2311-practice-quiz.html