
Updated PDF (New 2022) Actual SAP C-TS413-2020 Exam Questions
Verified C-TS413-2020 Exam Dumps PDF [2022] Access using Actualtests4sure
SAP C-TS413-2020 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
SAP C-TS413-2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Asset Management" certification exam verifies that the candidate has the fundamental and core knowledge in the area of Asset Management required for the consultant profile. This certificate proves that the candidate has an overall understanding and can implement the knowledge practically in projects to contribute to the success of the planning and implementation phases in a mentored role. Previous project experience is not necessarily a prerequisite to pass this exam.
NEW QUESTION 40
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.
- A. The document within the document management system can be assigned only at operational level.
- B. The long text of the reference notification can be automatically copied as the long text of the order.
- C. The assignment of the header notification to an order CANNOT be deleted.
- D. When an order is created based on a single notification, this notification becomes the header notification.
Answer: B,D
NEW QUESTION 41
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct Answers to this question.
- A. Open purchase orders are recompiled.
- B. Open reservations are recompiled.
- C. Open purchase requisitions are recompiled.
- D. Referenced notifications are put In Process again.
Answer: B,C
NEW QUESTION 42
Which of the following statements are correct?
- A. Overheads on actual costs are determined automatically when the order is saved.
- B. Overhead rates are used to allocate sales and administration overheads.
- C. Overheads on planned costs are determined as part of the standard cost estimate.
- D. Overhead rates enable you to allocate overhead costs to costaccounting objects according to cause.
Answer: B,C,D
NEW QUESTION 43
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.
- A. The assignment of a control key with the service indicator set is mandatory.
- B. The actual value entry can only be recorded via the service entrysheet.
- C. The assignment of service master records to an order operation is optional.
- D. The assignment of a control key with the service indicator set is mandatory.
- E. The usage of a model service specification is mandatory.
Answer: A,B,D
NEW QUESTION 44
Which operations can the responsible person preform after a maintenance order in technically completed?
choose 3 answers
- A. create invoice receipt for delivered material
- B. change the planned cost
- C. update the estimate cost
- D. lock or unlock the order
- E. change thesettelement rule
Answer: A,D,E
NEW QUESTION 45
Where can the planner check the material availbility? choose 3 answer
- A. from the reservation list
- B. within an individual order
- C. within the SAP fiori-based background job
- D. from the list of orders
- E. within the SAP fiori-based material document overview
Answer: A,B,D
NEW QUESTION 46
What activities can be performed with a deliverydocument?
- A. Credit memo
- B. Debit memo
- C. Goods issue
- D. Picking
Answer: C,D
NEW QUESTION 47
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.
- A. Overall costs are dynamically summed up on the header level.
- B. Purchase requisitions have the operation as account assignment.
- C. The settlement rule is maintained on the header level.
- D. Costs are stored only for the operation object.
- E. A technical object must be assigned to an order operation.
Answer: A,D,E
NEW QUESTION 48
Which of the following are checking instructions used to control availability checks?
- A. Checking types
- B. Checking rules
- C. Checking groups
- D. Checking profiles
Answer: B,C
NEW QUESTION 49
What is the missing word? With SAP S/4HANA, OLTP and_______applications are managed within the same system.
- A. JSON
- B. HTTP
- C. ETL
- D. OLAP
Answer: D
NEW QUESTION 50
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to the combination of fleet object type and equipment category.
- B. Define the field selection for the vehicle equipment master data.
- C. Assign a view profile to the combination of equipment category and vehicle class.
- D. Assign a view profile to an equipment category for fleet equipment.
Answer: A
NEW QUESTION 51
You need to create a new functional location. Which actions can you perform with the SAP Fiori app
"Create Technical Object"? Note: There are 3 correct Answers to this question.
- A. Change a reference location.
- B. Edit classification data and characteristics.
- C. Create a task list for functional location.
- D. Assign documents.
- E. Assign a subordinate piece of equipment.
Answer: A,B,D
NEW QUESTION 52
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question.
- A. ESRI maps
- B. Work orders and operations
- C. Cost analytics
- D. Breakdown analytics
- E. Technical objects
Answer: B,D,E
NEW QUESTION 53
Which must you define before you can create a new function location? choose 2 answers
- A. status profile
- B. structure indicator
- C. functional location category
- D. reference functional location
Answer: B,C
NEW QUESTION 54
Which order type do you need when you refurbish defective parts? choose 1 answer
- A. order type of pereventive maintenance
- B. order type with investement indicator
- C. order type breakdown maintenance
- D. order type with refurbishment indicator
Answer: D
NEW QUESTION 55
Which of the following processes (applications) are part of the production processes?
- A. Delivery processing
- B. Master production scheduling
- C. Sales and Operations Planning
- D. Manufacturing execution
- E. Material requirementsplanning
Answer: B,C,D,E
NEW QUESTION 56
Which of the following is a prerequisite for external refurbishment?
- A. Activate the subcontracting indicator in an external activity.
- B. Select the material group for externally refurbished materials.
- C. Define the order type for external refurbishment.
- D. Create the purchasing info record for the external provider.
Answer: A
NEW QUESTION 57
What is the function of the print diversion setting?
- A. It enables you to define which shop papers are printed as a system default.
- B. It enables you to chose a printer based on certain fields in the order.
- C. It enables you to determine which papers are printed for the technician.
- D. It tells the system that a shop paper for an order is ready to be printed.
Answer: B
NEW QUESTION 58
Which statement is correct about the SAP Fiori tile group? Note:There are 2 correct answers to this question.
- A. It is based on an SAP Fiori tile catalog.
- B. lt provides only SAPUI5-based apps.
- C. It is assigned via a portal role.
- D. It can be assigned directly to the user via personalization.
Answer: A,B
NEW QUESTION 59
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.
- A. Change a reference location.
- B. Edit classification data and characteristics.
- C. Create a measuring point.
- D. Assign documents.
- E. Assign a subordinate piece of equipment.
Answer: B,C,D
NEW QUESTION 60
With SAP S/4HANA embedded analytics, which tools are aimed at end users?
- A. SAP Smart Business cockpits
- B. Query Designer
- C. Analytical SAPFiori applications
- D. Design Studio
- E. Query Browser
Answer: A,C,E
NEW QUESTION 61
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.
- A. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- B. You do NOT have access to the SAP S/4HANA back end system.
- C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
- D. You have access to the SAP S/4HANA back end system.
Answer: A,B
NEW QUESTION 62
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct Answers to this question.
- A. Segment
- B. Object network
- C. Start marker
- D. Type of offset
- E. Unit of measure
Answer: C,D,E
NEW QUESTION 63
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to the combination of fleet object type and equipment category.
- B. Define the field selection for the vehicle equipment master data.
- C. Assign a view profile to the combination of fleet object type and usage type.
- D. Assign a view profile to an equipment category for fleet equipment.
Answer: A
NEW QUESTION 64
......
Try Best C-TS413-2020 Exam Questions from Training Expert Actualtests4sure: https://surepass.actualtests4sure.com/C-TS413-2020-practice-quiz.html

